What’s on the needles January 2015?

Kiri shawl wip Jan 2015

Kiri – This languished over the first part of the winter as I got on with Christmas things, but it’s Malabrigo, and I’m probably only about three pattern repeats from the end. The problem is that every time I try to knit it, someone wants to sit on my lap. But I just need to get it done, so that I can actually wear it while it’s still cold. And it’s mostly still cold. Especially when the wind is blowing as hard as it has been recently.

IMG_1734

Sock – I bought myself some Regia for my Christmas Stocking this year, and promptly started a sock on Christmas day. This is my out and about sock, but for some reason I actually haven’t been working on it much in the last couple of weeks.

IMG_1731

CP’s Cowl – I knit LR a cowl (to replace the one she snipped into last year – yeah it’s was pretty horrifying, but she was 3), in a single session while I was in bed ill, watching Leverage. W was adventuring at the University Museum. It was heaven and just what I needed. I started CP’s cowl straight after, because although she will probably only agree to wear it when it’s REALLY COLD (and who knows if it will get REALLY COLD this year?) but I wanted to have it done, then it’s done and then all three have cowls that will work for the next few years. And now I’ve stalled (because it’s not REALLY COLD and she is nearly 2 and probably will scream blue murder when I try to put it on her.) But I need to get it done.

stripey swatch

Stripey Swatch – The BFF destashed and I got the goodies, which is great because I can’t afford to buy garments worth of yarn right now. This was potentially going to be a stripey Effervescence Cardigan (assuming the swatch worked out) but the swatch was too stiff on the suggested needles, so now I think it’s probably going to be it’s own thing. I need to try the stitch pattern, with the striping to see if it’s really bad or not, and then go from there. (Yeah, I’m not sure what I’m doing, but the colours look really wearable, and I’m looking forward to another go-to cardigan for next autumn.

IMG_1737

The rug – I stalled. Mostly because having a toddler around it a bit like having a cat around, when it comes to having a box full of actively-being-used yarn around. But it’s good fun knitting something this big, and it will look great when it’s done, and most of the yarn is sitting there waiting to be knit up. So mostly it’s about getting my evenings back to work on it.

(Also – wow there is a theme there isn’t there, now that I can see all the photos together.)

I wonder what I can get finished before my ‘What’s on the needles February 2015?’ post next month?

What’s on your needles right now?